Setup
Client, reference, one time zone for every date, submission instructions and a pricing schedule.
Reqify Tenders · for consultancies advising buyers
Turn the project’s BRD requirements into an RFP, issue it with a response workbook, and let Reqify check every vendor’s claims against the vendor’s own documents — with the quotes. The AI suggests; your evaluation panel decides, and every step is on the record.
There’s no sample tender yet. The sample bid shows the same project, requirement quoting and source checks that Tenders builds on.
The solution shall provide IVR menus and prompts in English and French.
Vendor B proposal · p. 14 · quote checked word for word
The flag doesn’t fail the vendor on its own. An editor confirms or dismisses it, with a reason that goes in the report.
How it works
A tender runs inside the client’s delivery project, on its Procurement tab. Until the tender is issued, a step guide shows what is done and what comes next.
Client, reference, one time zone for every date, submission instructions and a pricing schedule.
Rated and pass / fail criteria with weights, a price method, evaluators and blind scoring.
Imported from the project’s BRD and FRD, numbered T-001 onwards, wording kept.
Background and scope written from the project’s documents; the rest comes from the tender itself.
Checks that weights total 100%, the deadline is set and no SME ask is open — then the files are fixed.
Their completed workbooks are read back by T-number: the claim, the response and the price.
Each claim checked against the vendor’s own documents, with verified quotes.
Evaluators score blind; editors agree a consensus beside the AI’s suggestions.
Choose a ranked vendor. Anyone but the top-ranked one needs a written rationale.
An evaluation report composed from the recorded evaluation, ready for the client.
Write the RFP
Import the business, functional and non-functional requirements from the project’s BRD and FRD. Each keeps its own wording and its project reference under its T-number, and priorities map to Mandatory or Rated.
The system shall route calls by caller language and agent skill.
Same wording, never rewritten. Must priority becomes Mandatory.
Comply, Partial or Does not comply, with the vendor’s response and page reference.
Evaluate
Assess with AI checks each vendor’s response against the vendor’s own proposal, pricing and other files. The completed workbook is the vendor’s claim, never its evidence.
| Criterion · 0–5 | Weight | Evaluators | Spread | AI suggestion | Consensus |
|---|---|---|---|---|---|
| Functional fit | 40% | 4 · 3 · 4 | — | 3 | 3.5 |
| Technical and security | 20% | 3 · 3 · 4 | — | 3 | 3 |
| Implementation approach | 20% | 2 · 4 · 4 | Flagged | 3 | 3.5 |
| Experience and references | 20% | 4 · 4 · 3 | — | 4 | 4 |
Built for a defensible procurement
Your client will be asked how the vendor was chosen. Tenders keeps the answer in one place.
Nobody sees another evaluator’s draft. Evaluators see the others’ submitted scores, the AI’s suggestions and the results only after submitting their own; revealing early is logged.
Vendors’ documents never enter the project’s knowledge base, and their responses are shown only to the tender’s editors and evaluators.
Submissions, reopened scores, consensus changes, waivers, the shortlist and the award are written to the security audit log, with who did it and when.
One project, both sides
Tenders run in delivery projects. If the project started as a bid in Reqify, the tender is pre-filled with the bid’s client, and the RFP is written from the BRD the project already produced.
The RFP pack, your proposal and the clarifications stay in the project’s knowledge.
Generated from the project, with the buyer’s requirements carried in as R-### numbers when the project came from a bid.
Imported as T-001 onwards, issued, assessed, scored and awarded — then the evaluation report.
What Reqify won’t do
A procurement has to stand up to questions from vendors and the client’s own governance. So some things are left to people by design.
Results are computed only from the scores your panel agrees. The AI’s suggested scores are shown beside them and never used as a score.
An AI flag on a mandatory requirement waits for an editor to confirm or dismiss it, with a reason. The award waits for every flag.
There is no vendor portal and no email to vendors. You send the RFP, workbook and addenda yourself.
Terms are quoted only from your approved library records; figures the documents don’t state become questions for your team.
Ask Project and document generation never read a vendor’s files, and the RFP is never drafted from them.
An awarded tender locks its scores, consensus and waivers and stays on record. It can’t be reopened or cancelled.
Plans and costs
Tenders uses your plan’s document allowance. Everything people do — setup, scoring, consensus, results — uses none.
| Professional | Team | Enterprise | |
|---|---|---|---|
| Active tenders at a time | 1 | 5 per workspace | Unlimited |
| Draft or regenerate the RFP | 1 document | 1 document | 1 document |
| Assess one vendor with AI | 1 document | 1 document | 1 document |
| Write the evaluation report | 1 document | 1 document | 1 document |
Free. Setup, importing requirements, the workbooks, vendors’ questions, addenda, scoring, consensus and results.
What counts as active. Draft, issued and evaluating tenders. Awarded and cancelled ones don’t count.
Not on Starter or the free trial. A failed AI run is refunded automatically. Up to 30 AI runs per tender a day.
The practical details
Start from the evidence
See how Reqify quotes and checks sources in the sample bid, then talk to us about running your client’s next vendor selection as a pilot.